Description
Features
  • Defrost initiation is adjustable from 1-8 cycles per day; minimum three hours between successive cycles.
  • Delay or pump down cycle is adjustable from 0-30 minutes; 3 minute graduation: for stopping fans, reducing refrigerant pressure, or hot gas pump down cycle.
  • 3-45 minutes defrost cycle; 3 min. graduation.
  • Drain or fan delay cycle is adjustable from 3-15 minutes; 3 minute graduation.
  • Sequence switching: 2 NO 2 NC.
  • Switch ratings: 10 amps, 345 VA pilot duty 120-240 Vac. Switches 2-4 and 3-4 carry 1/2 Hp rating.
  • Heavy steel gasketed case; gray finish, knockouts on bottom, side and back; hasp and staple for padlock. Available on bracket for sub-panel mounting
  • Ru recognized and CSA approved.
Read more
Manuals (1)
Specs
Voltage:
120v
Defrost Cycles:
8
Defrost Time:
3 to 45 Minutes
Switch:
SPST
Wiring Diagram:
1
Voltage:
208/277v
Features:
Bracket
×
Questions?
Speak with a real person who will go out of their way to help!
1-888-757-4774
Monday – Thursday
8am–5:45pm EST
Friday
9am–4:45pm EST

Product Reviews

Product Q&A