Pros, Join Our TradeMaster Program!
Description


Features
  • Defrost initiation is adjustable from 1-8 cycles per day; minimum three hours between successive cycles.
  • Delay or pump down cycle is adjustable from 0-30 minutes; 3 minute graduation: for stopping fans, reducing refrigerant pressure, or hot gas pump down cycle.
  • 3-45 minutes defrost cycle; 3 min. graduation.
  • Drain or fan delay cycle is adjustable from 3-15 minutes; 3 minute graduation.
  • Sequence switching: 2 NO 2 NC.
  • Switch ratings: 10 amps, 345 VA pilot duty 120-240 Vac. Switches 2-4 and 3-4 carry 1/2 Hp rating.
  • Heavy steel gasketed case; gray finish, knockouts on bottom, side and back; hasp and staple for padlock. Available on bracket for sub-panel mounting
  • Ru recognized and CSA approved.
Read more
Manuals (1)
Specs
Voltage:
240v
Defrost Cycles:
8
Defrost Time:
3 to 45 Minutes
Switch:
SPST
Wiring Diagram:
1
Voltage:
208/277v
Features:
Bracket
×
Questions?
Speak with a real person who will go out of their way to help!
Closed Now: Phone Hours
Monday – Thursday
8am–7:45pm ET
Friday
9am–7:45pm ET

Product Reviews

Product Q&A

Add-on Item

This item is cost-prohibitive to ship on its own but is available to ship with orders over $200.

Why don't we show the price of this item?

We try to always offer you the lowest prices possible, but some manufacturers require that we only show these low prices once you take further action.

To see the price, simply add the item to your cart or sign in.