Grundfos UPS15-58FC 3-Speed Circulator Pump, 1/25 HP, 115 Volt
The Grundfos UPS15-58FC is a 3-speed cast iron circulator pump designed for residential and light commercial hydronic heating applications, including boilers, radiant floor heating, and hot water recirculation systems. This 1/25 HP, 115-volt pump features a maintenance-free canned rotor design with an integrated check valve and accepts multiple flange sizes (3/4", 1", 1-1/4", and 1-1/2"). The unit delivers flow rates from 0 to 17 GPM and operates across three selectable speeds for optimized performance.
Key Features & Benefits
Compatibility & Requirements
Flanges must be purchased separately and matched to the specific pipe connection size in your system. The pump requires flange pairs sized for 3/4", 1", 1-1/4", or 1-1/2" connections depending on your piping configuration. Select flanges based on connection type: NPT threaded, sweat (solder), or press-fit connections are available. Installation should be performed by a qualified professional familiar with hydronic heating systems and local plumbing codes. System must be properly sized to ensure the pump's flow and head characteristics match the heating load and pipe friction losses. Verify that electrical service provides 115 volts AC, 60 Hz single-phase power. The pump shaft must be installed in a horizontal position, though piping can run vertically or horizontally. Confirm system operating pressure does not exceed 145 PSI and operating temperature remains between 36°F and 230°F. For systems with multiple zones, consider whether the integral check valve should remain installed or be removed to prevent flow restriction.
Installation & Care
Shut off power and drain the system section where the pump will be installed. Mount the pump with the motor shaft in a horizontal orientation and the pump body positioned to allow the flow direction arrow on the housing to match system flow direction. Install flange pairs on inlet and outlet pipes, ensuring gaskets are properly seated. Bolt the pump to the flanges using the provided hardware, tightening nuts evenly in a crisscross pattern. If removing the check valve for unrestricted flow applications, break apart the plastic valve assembly and extract the core using needle-nose pliers, then remove the remaining retention ring from the casting groove. Confirm all electrical connections are de-energized, then wire the pump according to the wiring diagram on the motor housing. Refill the system and purge all air from the piping and pump body through system bleed valves. Restore power and select the initial speed setting. Monitor the system for several heating cycles and adjust speed up or down as needed to achieve proper circulation and even heat distribution. Check for leaks at flange connections within the first 24 hours of operation. Inspect the pump quarterly for unusual noise, vibration, or heat. Maintain proper system water treatment to prevent scale buildup and corrosion. The high speed setting (87 watts) draws approximately 10% more power than medium speed and is designed for continuous operation when higher flow rates are required. Maximum flow through 3/4" Type M copper tube is 6 GPM; exceeding this rate can erode the tube. Recommended flow is 1 to 4 GPM per zone. For unequal length zones, install a circuit balancing valve on the shorter zone and set flow between 1 to 4 GPM, then adjust pump speed for the second zone. Excessive noise in baseboards indicates high flow rates.
What's Included
Frequently Asked Questions
Q: Can I install this pump with the flow direction from top to bottom in a vertical pipe run?
A: Yes, the pump can be installed in vertical piping with flow from top to bottom or bottom to top, provided the motor shaft remains in a horizontal position. Pumping upward allows a constant gravity-fed supply to ensure the pump does not run dry, which can cause seal failure.
Q: Should I remove the check valve for my application?
A: If replacing a pump that did not have a check valve built in, you likely don't need it. Removing the check valve will give slightly more flow. Check valves prevent backflow; if backflow is not a concern, remove it. To remove, break apart the plastic valve assembly, extract the core with needle-nose pliers, and remove the retention ring from the groove. The pump operates efficiently with or without the check valve installed.
| Frequency: | 60 Hz 60 Hz 60 Hz |
|---|---|
| Amperage: | 0.75 |
| Application: | Zoning |
| Poles: | 2 |
| Material: | Cast Iron |
| Voltage: | 115V |
| Max Pressure (PSI): | 145 |
| Type: | 3-Speed Pump |
| Features: | Integral Check Valve |
| Horse Power: | 1/25 |
| Flow Range (GPM): | 0-17 |
| Max Flow (GPM): | 17 |
| Max Head (Ft): | 19.5 |
| Head Range (ft.): | 0-19.5 |
| Hertz: | 60 |
| Phase: | 1 |
| RPM: | 2450 |
| Temperature Range (F): | 36°F - 230°F |
| Connection Size: | 1-1/4" 1" 1-1/2" 3/4" |
| Connection Type: | Flanged x Flanged |
This depends on the flow rate and head pressure of the system. These figures are primarily determined by the BTU load of the area and the total equivalent pipe run. It is always recommended to use separate pumps for areas of baseboard and areas of in-floor radiant.
I would say yes, it has three speeds on hi speed I've heated 1800 sq feet. You can run into problems if your using very small tubing.
Infloor radiant runs differently than baseboard. Infloor temps. are 95-125 degrees. Baseboard is 165-180 degrees. You don't want 180 deg water running thu PEX. You get overshoot on the thermostat set point maybe 10 deg above set point just from the hot water in the PEX continuing to radiate heat. The 2 sys must be hydraulically separated. If a Condensing Boiler, it should be hydraulically separated from the two heating zones, too. The pump to the baseboard get 180 deg water--the pump to the infloor gets 95 deg water. You need injection pumping or a mixing valve (Taco I series) for the infloor setup to get 95 deg water in the PEX.
The replacement check valve for this pump is part number 596630.
We'd recommend pulling the flow check out with a pair of needle-nose pliers.
A low pressure heating system normally operates around 12 - 22 psi.
You will want your expansion tank pressure to match your system operation pressure.
This pump can operate in a range of 0 - 17 gallons per minute.
There could be air in the system or a problem with the impeller.
The check valve is on the outlet of the pump.
This pump measures 6-1/2", flange to flange.